Overview
This commercial fit out involved refurbishing a 650-square-foot infrastructure cabin at GWR’s Bristol Depot. The aim was to transform an open-plan space into a functional area comprising three offices, a kitchen, and an entrance lobby.
Scope Of Work
- Installation of new acoustic-rated partitions.
- Construction of new MF ceilings and wall linings.
- Installation of new doors and ironmongery.
- Design and installation of a new kitchen.
- Comprehensive electrical and lighting installation.
- Addition of new air conditioning units.
- Installation of new soft flooring.
- Interior decoration throughout.
- Supply and installation of new furniture.
Key Phases
- Preparation: Site set-up and initial clearing of the open-plan cabin.
- Structural Works: Installation of partitions, ceilings, and skirtings.
- Mechanical and Electrical Installation: Integration of A/ c units and lighting systems.
- Finishing Works: Flooring, decoration, and kitchen fitting.
- Furniture Installation: Final placement of bespoke furniture.