Overview

This commercial fit out involved refurbishing a 650-square-foot infrastructure cabin at GWR’s Bristol Depot. The aim was to transform an open-plan space into a functional area comprising three offices, a kitchen, and an entrance lobby.

Scope Of Work

  • Installation of new acoustic-rated partitions.
  • Construction of new MF ceilings and wall linings.
  • Installation of new doors and ironmongery.
  • Design and installation of a new kitchen.
  • Comprehensive electrical and lighting installation.
  • Addition of new air conditioning units.
  • Installation of new soft flooring.
  • Interior decoration throughout.
  • Supply and installation of new furniture.

Key Phases

  1. Preparation: Site set-up and initial clearing of the open-plan cabin.
  2. Structural Works: Installation of partitions, ceilings, and skirtings.
  3. Mechanical and Electrical Installation: Integration of A/ c units and lighting systems.
  4. Finishing Works: Flooring, decoration, and kitchen fitting.
  5. Furniture Installation: Final placement of bespoke furniture.

Education

Overview

Project Solutions (a division of TPS360) was appointed as the Principal Contractor for the University of Bath’s Norwood & Wessex House project. The goal was to apply an anti-carbonation and corrosion inhibitor protection system to the buildings’ façades, enhancing the concrete’s durability and structural integrity to prevent carbonation degradation and ensure the buildings’ long-term reliability.

Challenges

The project faced several challenges, including access constraints, adverse weather conditions, and the need for additional concrete repairs.

Extensive scaffolding and access cradles were required due to the building’s height and the span of the façades.   Weather conditions, including high winds, rain, and temperatures below 5°C, posed potential delays, but these were effectively managed to keep the project on track.

During detailed inspections, it was found that approximately 10% of the panels required additional repairs. These repairs were carefully coordinated to minimise disruption to the overall schedule. Throughout the project, rigorous adherence to CDM regulations ensured safety, with regular audits and certified operatives on-site.

Outcome

The project was completed ahead of schedule, delivering enhanced structural integrity, and extending the lifespan of the façades.

Education

Summary of Services:

Furniture and Carpet Removal:
Cleared old items to make way for a fresh start

Floor Preparation:
Priming and levelling of subfloors before fitting conductive flooring

Partition Installation:
Added stud walls to define the new layout

Decorating:
Fresh paint on walls and ceilings

Sink Installation:
Lab-grade sink supplied and fitted

Conductive Flooring Installation:
Specialised conductive flooring with added safety features

Deep Cleaning:
Complete clean-up of labs and pathways

Project and Safety Management:
Oversaw compliance and safety throughout the project

Warehouse & Manufacturing

Warehouse & Manufacturing

Audio Foundry, known for its pioneering work in automotive audio solutions, engaged Project Solutions for a significant internal remodelling and mezzanine fit-out project in South Wales. The project was aimed at improving their research and development facilities, enhancing their ability to drive innovation in automotive audio technology. Audio Foundry collaborates with leading names in the industry, including Lamborghini, McLaren, Bose, Bang & Olufsen and Audi, developing innovative solutions and working closely with these prominent motor manufacturers to shape the future of automotive sound.

Warehouse & Manufacturing

Tymphany Acoustics, renowned for its innovative acoustic technology, partnered with Project Solutions for a significant remodelling project. Located in South Wales, the project aimed to revamp their existing facilities, focusing on operational efficiency and modernisation. The core objective was to create a dynamic workspace conducive to scientific exploration and product development.

Our approach prioritised operational continuity during the upgrade We employed a phased strategy tailored to project requirements, emphasising consistent stakeholder engagement to address technical needs effectively. Our focus was on enhancing functionality and innovation while aligning with stringent project standards

Hygienic Solutions

Hygienic Solutions

Hygienic Solutions

Industrial Painting & Cleaning